Partial road closure

0
450

A partial road closure at Road no.5 (in front of KAUST hotel under construction) will be in force from 27 December 2021 to 26 January 2022, for road cutting, excavation, and sewage tie-in connection.

For traffic towards garden area, an alternative route from Gate 3 (see maps below) will be diverted to the left along campus horse-shoe area. Motorists are advised to follow the road signage’s and directions given. Caution must be observed at all times. We apologize for the inconvenience caused and would like to thank your cooperation.

LEAVE A REPLY